Opens in a new tab
Service Area

Epoxy Flooring Parramatta

Epoxy floors, driveways and commercial coatings across Parramatta, from our base in Kellyville. Garages, warehouses, workshops and driveways, ground back properly and finished to last.

Fully Licensed & Insured
Residential & Commercial
Free On-Site Quotes
7-Year Product Warranty

Google reviews

Garage Epoxy Flooring Sydney

Epoxy Flooring For Parramatta Homes And Businesses

Parramatta runs from older brick homes with single garages through to new townhouses, and out to the commercial belt around Camellia, Rydalmere and Silverwater.

An older single garage, a townhouse garage and a warehouse floor each have their own problems, so the system that goes on top is chosen for the floor in front of us.

  • Free on-site quote: we come out to you, and the price is fixed in writing before anything is booked.
  • Homes and businesses: garages, driveways and patios, through to warehouses, workshops and commercial kitchens.
  • 7-year written product warranty on the coating that goes down.

What We Do In Parramatta

Garage Floors

Flake, metallic or solid colour over a diamond ground slab.

Commercial Floors

Warehouses, workshops, kitchens and showrooms, staged around your trading hours.

Driveways

Sealed, coated in epoxy, or ground back and polished.

Flake Finishes

Coloured vinyl flake under a clear top coat, in 76 colours.

Metallic

Metallic pigments are worked through the coating while it is still moving, so the finished surface has depth and swirl running through it.

Solid Colour

A single, even colour with a clear coat over it.

Evo Epoxy testing a concrete slab for moisture before coating

How We Prepare A Parramatta Floor Before Coating

We prepare the slab by grinding it back with diamond grinders, with dust extraction running the whole time.

Read more
  • That takes off the old coating, the glue, the sealer and the weak top layer of the concrete, and leaves clean, open concrete for the primer to grip.
Residential garage floor finished with an epoxy coating

How An Epoxy Garage Floor Holds Up In Parramatta

A single garage with an older Parramatta brick home, or a garage in one of the newer townhouses, has the car going in and out every day, and the floor takes that wear.

Read more
  • The whole weight of the car sits on four small tyre patches, and warm tyres can grab a coating that has not bonded properly and pull it up when the car is moved.
  • This is known as hot tyre pickup. In almost every case the fault is in the bond to the concrete, not in the coating, which is why the grinding and priming come first.
  • When the bond is right, hot tyre pickup is not something you need to worry about.
  • The system is chosen around how you use the garage. A work ute loaded with tools puts a floor through more than a hatchback and a couple of bikes.
  • Oil, coolant and brake fluid stay on top of the coating where you can wipe them up, rather than soaking into the slab
  • A dropped tool does not chip into the concrete, so one slip does not leave a permanent mark
  • Keeping it clean is a sweep, and a mop with warm water and a mild detergent every so often.
  • The grey dust that a bare slab keeps shedding stops, and that is usually the first thing people notice.
Completed epoxy garage floor

Why Our Epoxy Flooring Lasts

Diamond grinding takes the slab back to clean, open concrete so the primer can key in
Cracks and chips are cut out, filled and sanded flush before any coating goes near them
Oil spots are ground out and treated separately, because degreasing only lifts the surface
Moisture is tested first, since damp rising through concrete will lift a sealed coating

The Floors We Coat Around Parramatta

Epoxy is a two part coating. A resin and a hardener are mixed together and a chemical reaction sets them into a hard, bonded film across the concrete. It is not paint sitting on top of the slab, and it is not a sealer soaking into it. Done properly, the coating grips into the ground surface of the concrete and becomes part of the floor.

A home garage is usually bare concrete that dusts, stains under the car and marks up where the mower sits. A warehouse or workshop floor has hard wheels running the same lines every day and oil soaking into open concrete. The preparation is the same. What goes on top is not.

  • Homes: garage floors, driveways, patios and pool surrounds.
  • Commercial: warehouses, small factory units, workshops, commercial kitchens and showrooms.
  • Driveways: sealed, coated in epoxy, or ground back and polished.

How Much Does Epoxy Flooring Cost In Parramatta?

The price depends on what the concrete needs before the coating can go down. A moisture barrier on a damp slab, a lot of cracks to fill, or old paint to grind off will all add to it.

We check all of it at the quote.

The quote is fixed in writing once we have seen the floor.

Before And After

Two garage floors we have recently completed, both ground back, repaired and sealed. Drag the handle across each one to see the change.

The same garage after coating, finished in a grey flake epoxy floor
Bare concrete garage slab before epoxy coating, with the grinder at the side
Finished dark flake epoxy garage floor by Evo Epoxy
Evo Epoxy grinding a garage slab with dust extraction before coating

From Booking To Finished Floor

Get a Free Quote

Most garages are 1-2 days on site, so the prep is done properly and each coat gets the time it needs.

#1. Quote

We come out, look at the slab, test for moisture and talk through how you use the space. The quote follows the visit, not photos, and covers the prep, the system, your finish and the days on site.

#2. Preparation

Everything comes out before we start, shelving included, and we give you notice. Then the slab is ground back with dust extraction running and any cracks or holes are repaired. This is the noisy part.

#3. Coating And Handover

The primer goes on first, then the body coat with the flake or metallic worked into it, then the clear top coat. Each layer cures before the next goes down. You walk on it before you park on it, and we give you the dates for both.

Why Customers Choose Evo Over The Rest

What Makes Us Different

Our aim is a floor that still holds up and looks right years after we have finished it.

Preparation Comes First

Coatings fail at the bond, not in the coating itself. Every Evo floor is diamond ground back to open concrete, the cracks are repaired and the slab is moisture tested before any epoxy goes down.

Real Dates, And We Keep Them

We give you real dates. You will know when we arrive, how long we need, and when you can walk on the floor and park on it.

Commercial Grade Products Only

We do not use retail kits. Our coatings are commercial grade, Australian made epoxy and polyurethane systems, and we can show you the data sheet for whatever goes on your floor.

One Crew From Quote To Warranty

Your quote, your floor and your warranty all sit with one team. The people who quote the floor are the people who lay it, and we do not subcontract.

An Epoxy Floor Coating Built To Last

Every floor starts with diamond grinding and a moisture test, and we only use industrial grade Australian made coatings. That is why we can put a written 7-year product warranty on it.

Epoxy Floor Preparation And Full Curing Time

We do not rush a floor. Every coat gets the curing time it needs, because a coating that goes back into use too early is the one that lifts. Our working figure is 72 hours before the floor goes back into normal use, and if you need it sooner, ask us about a fast cure system.

Epoxy Flooring In Parramatta, Rated 5 Stars Across Sydney

Servicing Parramatta And Sydney Metro

Around Parramatta we cover Harris Park, Westmead, North Parramatta, Rosehill, Camellia, Rydalmere, Granville, Merrylands, Northmead, Oatlands, Dundas, Telopea, Ermington, Silverwater and Clyde.

Don't See Your Suburb?

These are the areas we work in most. We travel further for the right project, so ask us if your suburb is not listed.

Frequently Asked Questions

Yes. We are based in Kellyville and cover Parramatta and the suburbs around it as part of Sydney metro, including Harris Park, Westmead, North Parramatta, Rosehill, Granville, Merrylands, Rydalmere and Silverwater. The on-site quote is free and we come to you rather than pricing off photos.

Every Parramatta floor is quoted after we have seen it, because the slab decides the price. The quote covers the whole process: moisture check, diamond grinding, crack filling, primer, base coat and sealer. What changes it is whether the slab needs a moisture barrier, how many cracks need filling and whether old paint has to come off. Each of those is explained on our epoxy flooring cost page, and your quote is confirmed in writing after the visit.

Yes. Warehouses, small factory units, workshops, commercial kitchens and showrooms. The work is staged around when you trade, so the floor can go down in sections or outside business hours depending on what the site needs. We plan the staging with you before anything starts, so you know which areas are out of use and when.

A garage floor is usually done in a day on site. Bigger commercial floors run two or three days, plus curing. Evo Epoxy’s working figure is 72 hours before a floor goes back into normal use, and you can walk on it well before that. Weather, temperature and the condition of the slab all move it, so we give you the real dates for your floor when the work is booked.

The old coating comes off first, because whatever is already on the slab becomes the weakest point in the new floor. Stripping it back is part of the preparation and it is priced in from the start. Old paint means another round of grinding, which is one of the three things that moves a quote.

Yes, and there are three ways to finish a driveway. Sealing is the low preparation option with no grinding, and it goes straight over an old stencil concrete driveway. Epoxy is ground back first and laid as a stencil pattern, flake or solid colour. Exposed aggregate is ground and polished so the stone comes up sharp again.

Ready To Talk Epoxy Flooring In Parramatta?

Free on-site assessment and a fixed written quote within one business day.

Get A Free Quote

Tell us about your floor and we will get back to you quickly to book your free on-site quote. We cover Parramatta and the surrounding suburbs as part of Sydney metro.

0468 333 881
Call or text

Residential & Commercial
Fully Licensed & Insured

7-Year Product Warranty
Written warranty

sales@evoepoxy.com.au
Email us

Fully Licensed & Insured · 7-Year Product Warranty
Evo Epoxy — Get a Free Quote (copy of evoepoxy.com.au form 4, preview only)